thumbnail image
773-439-0519
info@ckleng.com
broken image
broken image
  • HOME
  • COMPANY 
    • In The Press
    • Leadership
    • Mission, Vision and Values
    • Outreach
  • SERVICES 
    • Aviation
    • Construction Management
    • Environmental Engineering
    • Mass Transit
    • Rail
    • Toll Roads
  • CAREERS 
    • Careers and Culture
    • Offices & Contact
  • INSIGHTS
  • …  
    • HOME
    • COMPANY 
      • In The Press
      • Leadership
      • Mission, Vision and Values
      • Outreach
    • SERVICES 
      • Aviation
      • Construction Management
      • Environmental Engineering
      • Mass Transit
      • Rail
      • Toll Roads
    • CAREERS 
      • Careers and Culture
      • Offices & Contact
    • INSIGHTS
773-439-0519
info@ckleng.com
broken image
broken image
  • HOME
  • COMPANY 
    • In The Press
    • Leadership
    • Mission, Vision and Values
    • Outreach
  • SERVICES 
    • Aviation
    • Construction Management
    • Environmental Engineering
    • Mass Transit
    • Rail
    • Toll Roads
  • CAREERS 
    • Careers and Culture
    • Offices & Contact
  • INSIGHTS
  • …  
    • HOME
    • COMPANY 
      • In The Press
      • Leadership
      • Mission, Vision and Values
      • Outreach
    • SERVICES 
      • Aviation
      • Construction Management
      • Environmental Engineering
      • Mass Transit
      • Rail
      • Toll Roads
    • CAREERS 
      • Careers and Culture
      • Offices & Contact
    • INSIGHTS
broken image
  • Excellence in

    Construction

    Management

     

  • CKL Engineers, LLC is the go-to firm for expert construction management and inspection services, delivering unparalleled results time and time again.

    Construction and Program Management Portfolio

    broken image

    IDOT - I-57 Milling and Resurfacing

    CKL provided Phase III engineering services for I-57 between mile markers 279 and 286 in Iroquois County, Illinois. This included the resurfacing of two lanes between Onarga and Gilman, Illinois, as well as interchange ramps with Illinois Route 54 and U.S. 24. The project began on May 20th, 2024, and was completed before the end of the year.

    Read More
    broken image

    CDOT - C*NECT Program

    CKL delivers its services and assets to CDOT through the Chicago Neighborhood Engineering and Construction Team, or C*NECT, created as a joint venture between Civiltech Engineering, Inc. (CEI) and Infrastructure Engineering, Inc. (IEI). We are responsible for providing Phase II and Phase III engineering services citywide.

    Read More
    broken image

    IDOT - IL-75 (Blackhawk Blvd)

    CKL Engineers provided CEI services for the reconstruction and widening of Blackhawk Blvd (IL-75) in Rockton, Illinois. The improvements included installation of a new storm sewer with inlets and catch basins, reinforced concrete driveway for the local fire station, landscaping, erosion control, and other infrastructure improvements.
    CKL served as a prime consultant on this IDOT project, and our inspectors were on site providing daily documentation of the work as it progressed.

    broken image

    IDOT - IL-171 Bridge Repairs

    CKL Engineers provided Phase III professional services to repair the IL 171 bridge over Salt Creek in Lyons, IL. CKL was responsible for inspecting contract work which included deck repairs, installation of a latex concrete overlay on the bridge deck, substructure concrete repair, and related incidental and collateral work necessary to complete the improvements. Overseeing the construction engineering project was necessary to ensure the work complies with IDOT standards and specifications.

    Read More
    broken image

    IDOT - U.S. 41, Illinois 120 to Park Avenue West

    CKL provided Phase III engineering services for the improvement of US 41, from IL 120 to Park Ave West. This resurfacing improvement includes, but not limited to, pavement patching, hot-mix asphalt surface removal, combination concrete curb and gutter removal and replacement, and more.

    broken image

    IDOT - Adams St & Jackson Blvd Bridge
    Reconstruction over I-90/94

    CKL provided Phase III engineering services for the construction inspection of two bridge reconstruction projects on Adams St and Jackson Blvd over I-90/94, as well as the widening of I-90/94 itself.
    The work included the removal of the existing bridges, the construction of two new bridges, installation of new exit and
    entrance ramps, and more. CKL's tasks included maintenance of traffic inspection, daily activity reports, and inspection of daily construction, which helped ensure all work was up to Illinois standards and specifications.

    Photo Credit: H.W. Lochner

    broken image

    CDOT - Damen-Elston-Fullerton Intersection Improvement

    CKL provided Phase III engineering services for the reconstruction of traffic and bike lanes along Damen, Fullerton and Elston roadways. The project included the widening of Damen Avenue for the construction of improved bike accommodations, widening of the north sidewalk along Fullerton and the resurfacing of all streets within the project limits. The work that was done included sanitary and storm sewer installation and repairs as required, water main installation, placement of asphalt and PCC pavement, curb and gutter, sidewalk installation, tree planting and CDOT database management.

    Read More
    broken image

    IDOT - I-55, I-94 to Lake Shore
    Drive Interchange Reconstruction

    CKL provided CE&I for I-55 (Stevenson Expressway), I-94 (Dan Ryan Expressway), and Lake Shore Drive. The project included the removal of the existing bridges and installation of three new bridge structures with a project length of 1.1 miles. Tasks included structural steel bridge on-site design changes, inspection of girder installation, bearing plates, snug tightening and final tightening of bolts and nuts, bridge deck forms, reinforcement, and concrete deck pours.

    broken image

    CDOT - U.S. 41, South Lake Shore Drive Extension

    CKL provided documentation support on the southern U.S. 41 extension. This was our first project of this scale, creating new transit and biking infrastructure, speeding up commutes across Chicago's South Side, and provided road access to the former U.S. Steel site, now being redeveloped into a quantum computing hub 11 years later.

    Read More

©2024-2026 CKL | All Rights Reserved

    Cookie Use
    We use cookies to ensure a smooth browsing experience. By continuing we assume you accept the use of cookies.
    Learn More