thumbnail image
773-439-0519
info@ckleng.com
broken image
broken image
  • HOME
  • COMPANY 
    • In The Press
    • Leadership
    • Mission, Vision and Values
    • Outreach
  • SERVICES 
    • Aviation
    • Construction Management
    • Environmental Engineering
    • Mass Transit
    • Rail
    • Toll Roads
  • CAREERS 
    • Careers and Culture
    • Offices & Contact
  • INSIGHTS
  • …  
    • HOME
    • COMPANY 
      • In The Press
      • Leadership
      • Mission, Vision and Values
      • Outreach
    • SERVICES 
      • Aviation
      • Construction Management
      • Environmental Engineering
      • Mass Transit
      • Rail
      • Toll Roads
    • CAREERS 
      • Careers and Culture
      • Offices & Contact
    • INSIGHTS
773-439-0519
info@ckleng.com
broken image
broken image
  • HOME
  • COMPANY 
    • In The Press
    • Leadership
    • Mission, Vision and Values
    • Outreach
  • SERVICES 
    • Aviation
    • Construction Management
    • Environmental Engineering
    • Mass Transit
    • Rail
    • Toll Roads
  • CAREERS 
    • Careers and Culture
    • Offices & Contact
  • INSIGHTS
  • …  
    • HOME
    • COMPANY 
      • In The Press
      • Leadership
      • Mission, Vision and Values
      • Outreach
    • SERVICES 
      • Aviation
      • Construction Management
      • Environmental Engineering
      • Mass Transit
      • Rail
      • Toll Roads
    • CAREERS 
      • Careers and Culture
      • Offices & Contact
    • INSIGHTS
broken image
  • Toll Excellence

    Every Project

     

  • CKL Engineers, LLC is the go-to firm for expert construction management and inspection services on toll roads, delivering unparalleled results time and time again.

    Toll Portfolio

    broken image

    Mile Long Bridge

    CKL Engineers provided CEI services for the Mile Long Bridge, a critical piece of infrastructure on the Tri-State Tollway (I-294). Located between Willow Springs and Hodgekins, IL, the bridge carries traffic over two major railroads, three water resources, local roads, and a major distribution center for UPS and the Burlington Northern Santa Fe (BNSF) Railway. The $500 million Mile Long Bridge Project began in Summer 2019 and was completed in 2023.

    Photo Credit: Roads and Bridges

    Read More
    broken image

    I-294/57 Interchange

    CKL provided CEI services on various relocation projects in advance of Illinois Tollway's interchange project.

    Photo Credit: Wight and Company

    Read More
    broken image

    Deerpath Road Bridge Reconstruction over I-88

    CKL served as a Prime firm providing resident engineering and contract administration services for the full bridge replacement over I-88 Reagan Memorial Tollway. The new bridge required two 13-foot lanes of traffic and 5-foot shoulders on Deerpath Road. In addition, the previous four-span structure was replaced with a two-span bridge.

    Read More
    broken image

    Systemwide Sign Structure and DMS Improvements

    CKL is the lead firm providing Resident Engineering & Contract Administration services to remove existing signing, replace overhead and ground mounted signs, and provide Dynamic Message Board improvements.

    broken image

    M-8 Maintenance Facility Westbound Access Road

    CKL provided resident engineering & CEI services for a tollway maintenance vehicle access ramp with new retaining wall, lighting, drainage, concrete barrier wall, and underpass lighting.

    Read More
    broken image

    I-57 Roadway and Bridge Widening - Kedzie Ave to CSX RR

    CKL oversaw the widening of I-57, reconstruction of I-57 bridges over 147th Street, construction of the new CD Road Bridges over 149th, 147th and Dixie Highway, and the construction of CD Roads A and C.

    broken image

    Tri-State Tollway (I-294) Advanced
    Shoulder Rehabilitation and Crossover
    Construction

    CKL provided Phase II engineering services on I-294 from 95th St to LaGrange Road (Mile Post 17.8 to Mile Post 20.7). CKL revised drawings and developed plan sheets for bid packages. Other responsibilities included analyzing pavement marking and grading elevations for the work area, updating special provisions, grading to maintain proper drainage, shoulder improvement design, pavement marking removals and layout, and more.

©2024-2026 CKL | All Rights Reserved

    Cookie Use
    We use cookies to ensure a smooth browsing experience. By continuing we assume you accept the use of cookies.
    Learn More